Road Closures
The City of Overland Park is committed to getting you to your destination quickly and safely.
Therefore, use the interactive road closure map to help you determine your best route when traveling in Overland Park.
The map shows all closures within the city that last longer than 24 hours. "Closures" include:
* lane reductions (orange lines on the map)
* full street/thoroughfare (red lines)
How to use the map
The map is defaulted to show the entire city although you can focus on a particular area by using either the zoom slider bar or by clicking and dragging a rectangle with the "Zoom In" tool (upper left corner of map). Select the "Info Tool" and then click on any of the colored lines to see information about the closure in the Info box to the left of the map.
To check on a specific closure, find the project below and select the triangle icon or use the interactive road closure map.
| Current Road Construction Projects |
| Map |
Reopens |
Project |
|
|
|
105th Street; West of Mission Road
|
Road Closure
|
105th Street, west of Mission Road to the roundabout will be closed to through traffic beginning Monday, January 26th at 8:00 a.m. for an anticipated 4 months for construction of Mission Farms West.
Contact:
Brad Thomas
(913) 927-3431
bradt@neighborsconstruction.com
|
|
|
Intersection; 159th & Lowell
|
Road Closure
|
Beginning Monday, March 26, 2012, through Friday, May 25, 2012, (approximately 60 days); the north leg of 159th Street and Lowell Avenue will be closed for roadway improvement. Detours will be posted.
Contact:
Chris Hutton
913-233-9657
chris.hutton@opkansas.org
|
|
|
Switzer; College to 116th St
|
Road Closure
|
Beginning Monday, July 18, 2011, through Friday, April 27, 2012, Switzer Road between College Boulevard to 116th Street will be completely closed to all traffic for road and bridge construction. Detours will be posted.
Contact:
Justin Nickel
913-895-6180
justin.nickel@opkansas.org
|
|
|
Quivira, 99th St to 105th St
|
Lane Reduction
|
Northbound Quivira Road will be reduced to one lane from 99th Street to 105th Street from May 14 to June 5. Work is to construct two northbound outside lanes.
Access to side streets east of Quivira, including 99th and 103rd Streets will be impacted throughout the 20 days, with closures. There will NOT be a detour for 99th Street Closure, but WILL BE a detour for 103rd Street closure.
There is no impact to southbound through lanes.
Contact:
Alan Daniels
(913) 895-6039
alan.daniels@opkansas.org
|
|
|
NB I-35 Hwy to 75th St Exit Ramp
|
Road Closure
|
Weather permitting, beginning Monday, March 19, 2012, at 9:00 a.m. through Wednesday, June 20, 2012 (approximately 90 days), the northbound I-35 to 75th Street exit ramp will be closed to complete tie-in work to the new 75th Street ramp system. All other ramps will be open.
Contact:
Justin Nickel
913-895-6180
justin.nickel@opkansas.org
|
|
|
Quivira, 105th St to 109th St
|
Lane Reduction
|
Lane reduction on Quivira from 105th to 109th Street. Also, both ramps closed.
Contact:
Brian Bosak with KDOT
913-764-4525
bbosak@ksdot.org
|
|
|
Quivira Ramps to I-435
|
Road Closure
|
All on and off ramps from Quivira to I-435 are closed.
Contact:
Brian Bosak with KDOT
913-764-4525
bbosak@kdot.org
|
| Future Road Construction Projects |
| None |
If you have questions, contact the Public Works Department at 913-895-6040 or by email engineer@opkansas.org.
Sign up for RSS Feed