Road Closures
The City of Overland Park is committed to getting you to your destination quickly and safely.
Therefore, use the interactive road closure map to help you determine your best route when traveling in Overland Park.
The map shows all closures within the city that last longer than 24 hours. "Closures" include:
* lane reductions (orange lines on the map)
* full street/thoroughfare (red lines)
How to use the map
The map is defaulted to show the entire city although you can focus on a particular area by using either the zoom slider bar or by clicking and dragging a rectangle with the "Zoom In" tool (upper left corner of map). Select the "Info Tool" and then click on any of the colored lines to see information about the closure in the Info box to the left of the map.
To check on a specific closure, find the project below and select the triangle icon or use the interactive road closure map.
| Current Road Construction Projects |
| Map |
Reopens |
Project |
|
|
|
Metcalf Ave.: Shawnee Mission Pkwy to 75th St. & 86th St. to 99th St.
|
Lane Reduction
|
Metcalf Ave. will be milled and resurface. All work except milling and overlay operations on the four lane section will be done between the hours of 8:30 a.m. to 4:00 p.m. Monday thru Friday. Milling and Overlay operations on the four lane section will be done between the hours of 7:00 p.m. to 5:00 a.m. Sunday thru Friday.
Contact:
Michael Hale
913.895.6012
michael.hale@opkansas.org
|
|
|
Indian Creek Highland Village
|
Lane Reduction
|
Roe inside lanes both North and South bound will be closed from 103rd to 107th street from 8:30 am. to 4:00 pm. 6/16/10 through 9/17/10 to add left turn lanes.
Contact:
Dan White
913-895-6260
jdwhite@opkansas.org
|
|
|
103rd St.: US-69 to Quivira Rd.
|
Lane Reduction
|
103drd St. work will consist of curb replacement underdrain installation, street milling and resurfacing. Work will be done between the hour of 8:30 a.m. to 4:00 p.m. Monday thru Friday. At times lanes will be reduced to one lane in each direction.
Curb & Gutter replacement should start September 7th follow with milling and overlay work.
Contact:
Michael Hale
913.895.6012
michael.hale@opkansas.org
|
|
|
NB & SB Antioch; 110th thru 117th
|
Lane Reduction
|
THE LEFT TURN LANES FROM NORTH BOUND AND SOUTH BOUND ANTIOCH ROAD AT 110TH STREET, SHANNON VALLEY SHOPPING CENTER ENTRANCES, 116TH STREET, 116TH TERRACE, AND 117TH STREET WILL BE CLOSED TO TRAFFIC BEGINNING AT 7:00 AM ON MONDAY, AUGUST 30, UNTIL MONDAY, SEPTEMBER 27, 2010, DURING STREET RECONSTRUCTION.
U-TURNS ALLOWED AT 115TH STREET AND 120TH TERRACE.
Contact:
Alan Daniels
913-233-9432
alan.daniels@opkansas.org
|
|
|
143rd, Quivira to Switzer
|
Road Closure
|
143rd Street will be closed for construction from June 1st to October 15th, 2010. All side roads will be closed at 143rd for the duration of construction. Construction will include divided 4-lane roadway, storm sewer, sidewalk, bike path, street lighting and traffic signals at the 143rd and Quivira intersection and the 143rd and Switzer intersection. Detours will be 135th Street and 151st Street via Quivira Road and Switzer Road.
Contact:
Eric Keenan
913-895-6028
eric.keenan@opkansas.org
|
|
|
NB U.S. 69 Highway @ 103rd Street
|
Road Closure
|
The ramps from Northbound U.S. 69 Highway to and from 103rd Street will be closed starting Monday, February 22nd, 2010 until approximately November 2010 for reconstruction.
Contact:
Justin Nickel
913-895-6180
justin.nickel@opkansas.org
|
|
|
SB U.S. 69 Highway at 103rd Street
|
Road Closure
|
SB U.S. 69 Highway ramps from 103rd Street to US 69 will be closed until November 2010, while northbound traffic is switched to the southbound pavement.
Contact:
Justin Nickel
913-895-6180
justin.nickel@opkansas.org
|
|
|
Antioch;108th Ter to 120th Ter
|
Lane Reduction
|
Antioch Rd, from 108th Ter to 120th Ter, will have lane closures daily, weather permitting, from Monday, April 26, 2010, until Monday, November 22, 2010 due to street improvements.
Speed Limit on Antioch, 108th Ter to 120th Ter will be reduced from 45 MPH to 35 MPH beginning June 22nd until November 22nd.
Contact:
Wayne Gudenkauf
913-895-6042
wayne.gudenkauf@opkansas.org
|
| Future Road Construction Projects |
| None |
If you have questions, contact the Public Works Department at 913-895-6040 or by email engineer@opkansas.org.
Sign up for RSS Feed